-7.089688498130248 |
109.99882234493272 |
Rehabilitasi jaringan irigasi DI Donomerto Desa Ngadiwarno Kecamatan Sukorejo KAB. KENDAL |
2.500.000.000,- |
KHOIRURIDLO, S.T., M.M |
KHOIRURIDLO, S.T., M.M |
FANANNI ADI NUGROHO, ST., M.P.W.K |
51387431 |
2.476.200.000,- |
Pekerjaan Konstruksi |
Tender |
2024-07-03 |
2024-10-30 |
000.3.3/4343/DPUPR |
2024-06-28 |
000.3.3/4464/DPUPR |
2024-07-03 |
CV ILHAM |
CV CITRA SOLUTION |
 |
-7.05835388646842 |
110.0111390487291 |
Rehabilitasi Jaringan Irigasi D.I. Getas Blawong Desa Getas Blawong Kecamatan Pageruyung (DAK Bidang Irigasi) |
2.672.418.000,- |
KHOIRURIDLO, S.T., M.M |
KHOIRURIDLO, S.T., M.M |
FANANNI ADI NUGROHO, ST., M.P.W.K |
49371467 |
2.645.237.813,- |
Pekerjaan Konstruksi |
Tender |
2024-06-28 |
2024-11-24 |
000.3.3/4053/DPUPR |
2024-06-24 |
000.3.3/4345/DPUPR |
2024-06-28 |
CV. KAKANK ADI |
PT TRI HASTA SEJAHTERA |
 |
-7.087959844665988 |
109.98264696914705 |
Rehabilitasi Jaringan Irigasi D.I. Mudal Desa Wadas Kecamatan Plantungan (DAK Bidang Irigasi) |
2.509.621.000,- |
KHOIRURIDLO, S.T., M.M |
KHOIRURIDLO, S.T., M.M |
FANANNI ADI NUGROHO, ST., M.P.W.K |
49371473 |
2.494.000.000,- |
Pekerjaan Konstruksi |
Tender |
2024-06-28 |
2024-11-24 |
000.3.3/4338/DPUPR |
2024-06-28 |
000.3.3/4340/DPUPR |
2024-06-28 |
CV USTRAINDO |
PT TRI HASTA SEJAHTERA |
 |
-7.105515242587589 |
110.2125856652856 |
Peningkatan Sistem Penyediaan Air Minum (SPAM) Jaringan Perpipaan Desa Banyuringin Kecamatan Singorojo |
728.121.000,- |
SUDARYANTO, S.T., M.M. |
SUDARYANTO, S.T., M.M. |
FURQAN WICAKSANA, S.T. |
47822876 |
718.577.580,- |
Jasa Lainnya |
Tender |
2024-06-20 |
2024-11-16 |
000.3.3/3874/DPUPR |
2024-06-20 |
000.3.3/3876/DPUPR |
2024-06-20 |
CV. WIGA JAYA |
CV. MAJU MULIA |
 |
-7.164816853869849 |
110.20915044704454 |
Peningkatan Sistem Penyediaan Air Minum (SPAM) Jaringan Perpipaan Desa Cening Kecamatan Singorojo |
1.106.762.000,- |
SUDARYANTO, S.T., M.M. |
SUDARYANTO, S.T., M.M. |
FURQAN WICAKSANA, S.T. |
47823905 |
1.095.850.722,- |
Pekerjaan Konstruksi |
Tender |
2024-07-15 |
2024-12-11 |
000.3.3/4865/DPUPR |
2024-07-15 |
000.3.3/4867/DPUPR |
2024-07-15 |
PT. ALTAMA INTI SUKSES |
CV. MAJU MULIA |
 |
-7.138065034795786 |
110.19616319099443 |
Peningkatan Sistem Penyediaan Air Minum (SPAM) Jaringan Perpipaan Desa Kaliputih Kecamatan Singorojo |
1.037.736.000,- |
SUDARYANTO, S.T., M.M. |
SUDARYANTO, S.T., M.M. |
FURQAN WICAKSANA, S.T. |
47825434 |
1.024.470.302,- |
Pekerjaan Konstruksi |
Tender |
2024-07-04 |
2024-11-30 |
000.3.3/4532/DPUPR |
2024-07-04 |
000.3.3/4534/DPUPR |
2024-07-04 |
CV. AMARTA JAYA SENTOSA |
CV. MAJU MULIA |
 |
-7.177377851121543 |
110.28092636028306 |
Peningkatan Sistem Penyediaan Air Minum (SPAM) Jaringan Perpipaan Desa Peron Kecamatan Limbangan |
1.062.737.000,- |
SUDARYANTO, S.T., M.M. |
SUDARYANTO, S.T., M.M. |
FURQAN WICAKSANA, S.T. |
47828259 |
1.043.976.713,- |
Pekerjaan Konstruksi |
Tender |
2024-06-20 |
2024-11-16 |
000.3.3/3760/DPUPR |
2024-06-14 |
000.3.3/3878/DPUPR |
2024-06-20 |
PT. ENGGAL SENTOSA SEJAHTERA |
CV. MAJU MULIA |
 |
-6.927377655983919 |
110.09086873847994 |
Peningkatan Sistem Penyediaan Air Minum (SPAM) Jaringan Perpipaan Desa Sendangkulon Kecamatan Kangkung |
907.922.000,- |
SUDARYANTO, S.T., M.M. |
SUDARYANTO, S.T., M.M. |
FURQAN WICAKSANA, S.T. |
47835315 |
900.380.000,- |
Pekerjaan Konstruksi |
Tender |
2024-06-25 |
2024-11-21 |
000.3.3/4138/DPUPR |
2024-06-25 |
000.3.3/4140/DPUPR |
2024-06-25 |
CV. PANCASAKTI GEMILANG |
CV. MAJU MULIA |
 |
-7.076507564889269 |
110.09507073322312 |
Perluasan Sistem Penyediaan Air Minum (SPAM) Jaringan Perpipaan Desa Kalices Kecamatan Patean |
475.841.000,- |
IRNITA MAHARDINI, ST., M.T |
IRNITA MAHARDINI, ST., M.T |
FURQAN WICAKSANA, S.T. |
47801159 |
472.000.000,- |
Pekerjaan Konstruksi |
Tender |
2024-06-20 |
2024-11-16 |
000.3.3/3761/DPUPR |
2024-06-14 |
000.3.3/3880/DPUPR |
2024-06-20 |
PT USTRAINDO MULYA ABADI |
PT. TIGATO SOLUSI TEKNIK |
 |
-7.11482491851266 |
110.0388730899431 |
Perluasan Sistem Penyediaan Air Minum (SPAM) Jaringan Perpipaan Desa Pakisan Kecamatan Patean |
390.000.000,- |
IRNITA MAHARDINI, ST., M.T |
IRNITA MAHARDINI, ST., M.T |
FURQAN WICAKSANA, S.T. |
47801531 |
386.000.000,- |
Pekerjaan Konstruksi |
Tender |
2024-07-01 |
2024-10-28 |
000.3.3/4388/DPUPR |
2024-07-01 |
000.3.3/4390/DPUPR |
2024-07-01 |
CV. CITRA MANDIRI UTAMA |
PT. TIGATO SOLUSI TEKNIK |
 |
|
|
Perluasan Sistem Penyediaan Air Minum (SPAM) Jaringan Perpipaan Desa Sukodadi Kecamatan Kangkung |
360.000.000,- |
IRNITA MAHARDINI, ST., M.T |
IRNITA MAHARDINI, ST., M.T |
FURQAN WICAKSANA, S.T. |
47815331 |
355.317.783,- |
Pekerjaan Konstruksi |
Tender |
2024-06-25 |
2024-10-18 |
000.3.3/4108/DPUPR |
2024-06-25 |
000.3.3/4110/DPUPR |
2024-06-25 |
CV. HARAPAN JAYA KONSTRUKSI |
PT. TIGATO SOLUSI TEKNIK |
 |
|
|
Pembangunan/Penyediaan Sistem Pengelolaan Air Limbah Terpusat Skala Permukiman KSM BORANGAN Desa Limbangan Kecamatan Limbangan |
482.338.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
Pembangunan/Penyediaan Sistem Pengelolaan Air Limbah Terpusat Skala Permukiman KSM MARGO ASRI Desa Singorojo Kecamatan Singorojo |
482.338.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
Pembangunan/Penyediaan Sistem Pengelolaan Air Limbah Terpusat Skala Permukiman KSM TIRTOSARI Desa Mulyosari Kecamatan Sukorejo |
482.338.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
Pembangunan Tangki Septik Skala Individual KSM DADI SEHAT Desa Sukodadi Kecamatan Singorojo |
400.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
Pembangunan Tangki Septik Skala Individual KSM MANUNGGAL SEDYO Desa Gondang Kecamatan Limbangan |
400.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
Pembangunan Tangki Septik Skala Individual KSM MOJO AJI Desa Mojo Kecamatan Ringinarum |
400.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
Pembangunan Tangki Septik Skala Individual KSM SEHAT MAKMUR Desa Sidomakmur Kecamatan Kaliwungu Selatan |
400.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
Penggantian Jembatan Jalan Banyuurip-Karangmulyo |
200.000.000,- |
SUDARYANTO, S.T., M.M. |
SUDARYANTO, S.T., M.M. |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
49810958 |
198.835.555,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-26 |
2024-08-24 |
000.3.2 / 4168 / DPUPR |
2024-06-26 |
000.3.2 / 4170 / DPUPR |
2024-06-26 |
BANGUN SENTOSA |
CV. PRISMA KREASI |
 |
|
|
Penggantian Jembatan Jl. Cepiring - Juwiring |
500.000.000,- |
SUDARYANTO, S.T., M.M. |
SUDARYANTO, S.T., M.M. |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51797124 |
487.202.070,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-08-07 |
2024-11-05 |
000.3.3/5483/ DPUPR |
2024-08-05 |
000.3.3/5483/ DPUPR |
2024-08-05 |
cv. rifasa persada |
CV. PRISMA KREASI |
 |
|
|
Penggantian Jembatan Jl. Langenharjo - Karangsari |
200.000.000,- |
SUDARYANTO, S.T., M.M. |
SUDARYANTO, S.T., M.M. |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51560772 |
198.897.973,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-09-09 |
2024-11-07 |
000.3.2 / 6528 / DPUPR |
2024-09-09 |
000.3.2 / 6530 / DPUPR |
2024-09-09 |
CV. BINTANG PRATAMA |
CV. PRISMA KREASI |
 |
|
|
Penggantian Jembatan Jl. Pegandon - Magangan |
1.000.000.000,- |
SUDARYANTO, S.T., M.M. |
SUDARYANTO, S.T., M.M. |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51960455 |
971.479.282,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-08-05 |
2024-11-03 |
000.3.3/5266/ DPUPR |
2024-07-30 |
000.3.3/5266/ DPUPR |
2024-07-30 |
CV. SIMENDU MULYA |
CV. PRISMA KREASI |
 |
|
|
Penggantian Jembatan Jl. Wonosari - Kartikajaya |
200.000.000,- |
SUDARYANTO, S.T., M.M. |
SUDARYANTO, S.T., M.M. |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
49810961 |
198.302.760,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-06-26 |
2024-08-24 |
000.3.2 / 4165 / DPUPR |
2024-06-26 |
000.3.2 / 4167 / DPUPR |
2024-06-26 |
CV. EL JAYA PERKASA |
CV. PRISMA KREASI |
 |
-6.966834699079201 |
110.05901647964495 |
Rehabilitasi Jl. Bahari |
600.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51413812 |
583.296.082,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-05-13 |
2024-08-05 |
000.3.3/2333/DPUPR |
2024-05-13 |
000.3.3/2335/ DPUPR |
2024-05-13 |
CV. PONCO LARAS |
CV. ARDI PERMANA PUTRA |
 |
-6.924363550986166 |
110.22198584396392 |
Rehabilitasi Jl. Banyutowo - Turunrejo |
100.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51529369 |
98.800.000,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-06-24 |
2024-08-22 |
000.3.2/4046/DPUPR |
2024-06-24 |
000.3.2/4048/DPUPR |
2024-06-24 |
CV. ADHI WIJAYA PERKASA |
CV. PRISMA KREASI |
 |
|
|
Rehabilitasi Jl. Banyutowo - Turunrejo (Paket 2) |
150.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-7.032579622459502 |
109.98924520332366 |
Rehabilitasi Jl. Bendosari - Tersono (Batas Kab. Batang) |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
52037592 |
487.207.800,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-15 |
2024-09-12 |
000.3.2/4015/DPUPR |
2024-06-24 |
000.3.2/4017/DPUPR |
2024-06-24 |
CV. raffasya putra |
CV. ESTU SAE K |
 |
-6.917185004311461 |
110.19580748397857 |
Rehabilitasi Jl. Griya Praja Mukti |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51784149 |
487.191.570,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-24 |
2024-09-20 |
000.3.2/4015/DPUPR |
2024-06-24 |
000.3.2/4017/DPUPR |
2024-06-24 |
CV. raffasya putra |
PT. GARDHA MANDIRI TUNGGAL |
 |
-7.050681072965311 |
109.98899844009432 |
Rehabilitasi Jl. Jatinem - Wadas |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
49733921 |
197.802.400,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-25 |
2024-09-22 |
000.3.2/5188/DPUPR |
2024-07-25 |
000.3.2/5189/DPUPR |
2024-07-25 |
CV. GANESAPUTRA |
CV. ESTU SAE K |
 |
-6.930825747174449 |
110.29703405220062 |
Rehabilitasi Jl. Kaliwungu - Mororejo |
750.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51960467 |
730.813.191,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-09 |
2024-10-07 |
000.3.3/4684/DPUPR |
2024-07-09 |
000.3.3/4686/DPUPR |
2024-07-09 |
CV. MULYA |
CV. PRISMA KREASI |
 |
-7.0339544341032285 |
110.00247014919297 |
Rehabilitasi Jl. Kebongembong - Mojoagung |
150.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.942769934653023 |
110.16781760612504 |
Rehabilitasi Jl. Lanji - Bulugede |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51530574 |
148.691.550,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-03 |
2024-08-31 |
000.3.2/4468/DPUPR |
2024-07-03 |
000.3.2/4470/DPUPR |
2024-07-03 |
CV. PANCASAKTI GEMILANG |
PT. GARDHA MANDIRI TUNGGAL |
 |
-6.937599250827802 |
110.25677038589494 |
Rehabilitasi Jl. Lengkong - Wonorejo |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51738060 |
486.998.800,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-10 |
2024-09-07 |
000.3.3 / 3500 / DPUPR |
2024-06-10 |
000.3.3 / 3502 / DPUPR |
2024-06-10 |
PT. DANUJA KARYA INDONESIA |
PT. GARDHA MANDIRI TUNGGAL |
 |
-7.190772886069721 |
110.2927639754489 |
Rehabilitasi Jl. Limbangan - Beku |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51529932 |
198.700.000,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-06-10 |
2024-08-08 |
000.3.3/3538/DPUPR |
2024-06-10 |
000.3.3/3540/DPU |
2024-06-10 |
CV. CIPTA GRAHA PERKASA |
PT. TIGATO SOLUSI TEKNIK |
 |
-7.082240997739807 |
110.0394470826723 |
Rehabilitasi Jl. Lingkar Barat Sukorejo |
150.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-7.105140745626388 |
110.25732828537004 |
Rehabilitasi Jl. Lingkar Bebengan |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51960475 |
487.222.525,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-12 |
2024-10-19 |
000.3.3/4815/DPUPR |
2024-07-12 |
000.3.3/4817/DPUPR |
2024-07-12 |
CV. CITRA MANDIRI UTAMA |
CV. MITRA MUDA REKAYASA |
 |
-7.102330074853813 |
110.27575506130235 |
Rehabilitasi Jl. Lingkar Utara Timur Boja |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
52164626 |
148.039.123,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-10-03 |
2024-12-01 |
000.3.3 / 7066 / DPUPR |
2024-10-03 |
000.3.3 / 7068 / DPUPR |
2024-10-03 |
CV. PUTRA JAYA ABADI |
PT. TIGATO SOLUSI TEKNIK |
 |
-6.918967544359721 |
110.19847525516526 |
Rehabilitasi Jl. Lingkungan Pasar Kendal |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
52006151 |
487.236.156,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-09-13 |
2024-12-02 |
000.3.3 / 6689 / DPUPR |
2024-09-13 |
000.3.3 / 6691 / DPUPR |
2024-09-13 |
CV. SIMENDU MULYA |
PT. GARDHA MANDIRI TUNGGAL |
 |
-7.077678745449472 |
110.29581262031571 |
Rehabilitasi Jl. Meteseh - Trisobo |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51530182 |
148.896.444,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-10 |
2024-09-07 |
000.3.2/4760/DPUPR |
2024-07-10 |
000.3.2./4762/DPUPR |
2024-07-10 |
CV. SUBUR MAKMUR |
PT. TIGATO SOLUSI TEKNIK |
 |
-7.032997560971198 |
110.03739621955901 |
Rehabilitasi Jl. Pageruyung - Sidomukti |
200.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.946689553701785 |
110.06444030441345 |
Rehabilitasi Jl. Parakan - Tanjunganom |
150.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.994375262501808 |
110.1486435206607 |
Rehabilitasi Jl. Puguh - Jatirejo |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51530295 |
148.633.547,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-09 |
2024-09-06 |
000.3.2 / 4719 / DPUPR |
2024-07-09 |
000.3.2 /4721/ DPUPR |
2024-07-09 |
CV KALI KUTO |
PT. GARDHA MANDIRI TUNGGAL |
 |
-7.140619991657988 |
110.297845734749 |
Rehabilitasi Jl. Purwogondo - Margosari |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51530362 |
198.023.311,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-08-26 |
2024-10-24 |
000.3.3/6057/DPUPR |
2024-08-26 |
000.3.3/6059/DPUPR |
2024-08-26 |
CV.HASTA KARYA JAYA |
PT. TIGATO SOLUSI TEKNIK |
 |
-6.961216990882103 |
110.24984492221849 |
Rehabilitasi Jl. Sawahjati |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
49733929 |
198.735.242,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-06-24 |
2024-08-22 |
000.3.2 / 4019 / DPUPR |
2024-06-24 |
000.3.2 /4021/ DPUPR |
2024-06-24 |
CV. MORO JAYA |
PT. TIGATO SOLUSI TEKNIK |
 |
-6.938744529242807 |
110.19715600647034 |
Rehabilitasi Jl. Sijeruk - Trompo |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51530439 |
148.480.315,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-03 |
2024-08-31 |
000.3.2 / 4451 / DPUPR |
2024-07-03 |
000.3.2 /4453/ DPUPR |
2024-07-03 |
CV. GANESAPUTRA |
PT. GARDHA MANDIRI TUNGGAL |
 |
-6.94758124718569 |
110.192642477341 |
Rehabilitasi Jl. Sukodono - Bulugede |
150.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-7.059574482503377 |
110.059540537186 |
Rehabilitasi Jl. Sukomangli - Kalilumpang |
1.000.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51530469 |
973.816.908,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-05-30 |
2024-08-27 |
000.3.3/2988/ DPUPR |
2024-05-30 |
000.3.3/2990/ DPUPR |
2024-05-30 |
CV. MULYA |
CV. MAJU MULIA |
 |
-6.951274015039494 |
110.07324828067796 |
Rehabilitasi Jl. Tambaksari - Tratemulyo |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51530488 |
198.410.647,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-19 |
2024-08-17 |
000.3.2 / 3801 / DPUPR |
2024-06-19 |
000.3.2 / 3803 / DPUPR |
2024-06-19 |
CV. ARFIA JAYA |
CV. ESTU SAE K |
 |
|
|
Rehabilitasi Jl. Tambaksari - Tratemulyo (Paket 2) |
150.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-7.045735063184034 |
109.98640371719378 |
Rehabilitasi Jl. Wadas - Bendosari |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51530529 |
198.036.000,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-25 |
2024-09-22 |
000.3.2/5192/DPUPR |
2024-07-25 |
000.3.2/5193/DPUPR |
2024-07-25 |
CV USTRAINDO |
CV. ESTU SAE K |
 |
-6.9236516646307145 |
110.2053759731824 |
Rehabilitasi Jl. Waluyo |
400.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51960483 |
389.636.455,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-03 |
2024-09-30 |
000.3.3/4454/ DPUPR |
2024-07-03 |
000.3.3/4456/ DPUPR |
2024-07-03 |
CV. MULYA |
PT. GARDHA MANDIRI TUNGGAL |
 |
-6.969458866264632 |
110.11759095825256 |
Rehabilitasi Jl. Weleri - Sedayu |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51530548 |
148.211.573,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-08-14 |
2024-10-12 |
000.3.3 / 5799 / DPUPR |
2024-08-14 |
000.3.3 / 5801 / DPUPR |
2024-08-14 |
CV. Duta Karya |
CV ASKHA |
 |
|
|
Rehabilitasi Jembatan Jl. Ngareanak - Banyuringin |
1.000.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
DEPPY NOR ADHITYA YUSI TAMA, S.T |
51797154 |
974.465.803,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-05 |
2024-10-03 |
000.3.3 / 4580 / DPUPR |
2024-07-05 |
000.3.3/4582/DPUPR |
2024-07-05 |
cv. rifasa persada |
PT. TIGATO SOLUSI TEKNIK |
 |
-7.135280223685206 |
110.19786410965027 |
Rekonstruksi Jl. Banyuringin - Kaliputih |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658553 |
149.072.672,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-06-19 |
2024-08-17 |
000.3.2/3831/DPUPR |
2024-06-19 |
000.3.2/3833/DPUPR |
2024-06-19 |
CV. PUTRA JAYA ABADI |
CV. MAJU MULIA |
 |
-7.123114383935506 |
110.21710422355682 |
Rekonstruksi Jl. Banyuringin - Kaliputih (Paket 2) |
1.000.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-7.101809726249224 |
110.28029335895555 |
Rekonstruksi Jl. Boja - Campurejo |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658554 |
148.973.455,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-06-24 |
2024-08-22 |
000.3.2 / 4062 / DPUPR |
2024-06-24 |
000.3.2 / 4064 / DPUPR |
2024-06-24 |
CV. BAROKAH |
PT. TIGATO SOLUSI TEKNIK |
 |
-7.113813526194316 |
110.2676601544954 |
Rekonstruksi Jl. Boja - Kaligading |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51784425 |
487.230.928,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-08 |
2024-10-05 |
000.3.3/4505/ DPUPR |
2024-07-04 |
000.3.3/4505/ DPUPR |
2024-07-04 |
CV. RIZKI BERKAH |
CV. MITRA MUDA REKAYASA |
 |
-7.158766552669192 |
109.99572542030364 |
Rekonstruksi Jl. Bringinsari - Purwosari |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658600 |
149.079.181,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-15 |
2024-09-12 |
000.3.2/4869/DPUPR |
2024-07-15 |
000.3.2/4871/DPUPR |
2024-07-15 |
CV. CENDANA PRIMA |
CV. MULYA KARYA |
 |
-6.935951241513469 |
110.22446420509371 |
Rekonstruksi Jl. Cangkring - Jaro |
1.600.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.947392458251958 |
110.2144938055426 |
Rekonstruksi Jl. Cangkring - Tosari |
325.061.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51649111 |
316.745.760,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-05-29 |
2024-08-26 |
000.3.3/2885/ DPUPR |
2024-05-28 |
000.3.3/2885/ DPUPR |
2024-05-28 |
CV. DINAMIKA BERKAH JAYA |
CV ASKHA |
 |
-6.950464741195957 |
110.21393921691924 |
Rekonstruksi Jl. Cangkring - Tosari (Paket 2) |
350.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
Rekonstruksi Jl. Cepiring - Juwiring |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51649205 |
486.789.000,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-06 |
2024-09-03 |
000.3.3/3140/ DPUPR |
2024-06-04 |
000.3.3/3140/ DPUPR |
2024-06-04 |
CV. ARFIA JAYA |
CV. MAJU MULIA |
 |
-6.921403179226893 |
110.15419300776632 |
Rekonstruksi Jl. Cepiring - Pidodokulon |
700.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
52238647 |
682.136.000,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-09-03 |
2024-12-02 |
000.3.3/6201/ DPUPR |
2024-08-29 |
000.3.3/6201/ DPUPR |
2024-08-29 |
RIZQI HALAL |
CV ASKHA |
 |
-7.100292635552864 |
109.9969400532881 |
Rekonstruksi Jl. Donomerto - Gentinggunung - Kediten |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51671141 |
148.288.169,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-04 |
2024-09-01 |
000.3.2/4515/DPUPR |
2024-07-04 |
00.3.2/4517/DPUPR |
2024-07-04 |
CV. CENDANA PRIMA |
CV. MULYA KARYA |
 |
-6.973177045685313 |
110.1379296048802 |
Rekonstruksi Jl. Gemuh - Sedayu |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
52006023 |
487.200.000,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-24 |
2024-10-22 |
000.3.3/5088/ DPUPR |
2024-07-23 |
000.3.3/5088/ DPUPR |
2024-07-23 |
CV. EL JAYA PERKASA |
CV. ESTU SAE K |
 |
-7.138584330595581 |
110.2326473783565 |
Rekonstruksi Jl. Getas - Kaliputih |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658582 |
198.498.379,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-05-30 |
2024-07-28 |
000.3.2/3030/DPUPR |
2024-05-30 |
000.3.2/3032/DPUPR |
2024-05-30 |
CV. MULYA |
CV. MAJU MULIA |
 |
-7.061414083964417 |
110.23831723323424 |
Rekonstruksi Jl. Goakiskendo - Kalirejo |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658586 |
198.500.000,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-10 |
2024-08-08 |
000.3.1/3524/DPUPR |
2024-06-10 |
000.3.1/3526/DPUPR |
2024-06-10 |
CV. PUTRA JAYA ABADI |
CV. SUMUR AGUNG |
 |
-6.920605794452245 |
110.23277268337846 |
Rekonstruksi Jl. Jaro - Pening |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51649178 |
485.397.503,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-05 |
2024-09-03 |
000.3.3/3099/ DPUPR |
2024-06-03 |
000.3.3/3099/ DPUPR |
2024-06-03 |
CV. RAPI KARYA MANDIRI |
CV. SUMUR AGUNG |
 |
-6.918269465117665 |
110.2334247641827 |
Rekonstruksi Jl. Jaro - Pening (Paket 2) |
1.350.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-7.137933502369295 |
109.96633781260586 |
Rekonstruksi Jl. Jatinem - Kediten |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51960494 |
486.862.594,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-24 |
2024-10-22 |
000.3.3/5148/DPUPR |
2024-07-04 |
000.3.3/5150/DPUPR |
2024-07-24 |
CV. WARDHANA SURYA ABADI |
CV. MITRA MUDA REKAYASA |
 |
-7.138576068894472 |
109.96572142869385 |
Rekonstruksi Jl. Jatinem - Kediten (Paket 2) |
600.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.944299104584668 |
110.1818820819184 |
Rekonstruksi Jl. Jetis - Bojonggede |
150.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
Rekonstruksi Jl. Kaliputih - Cening |
4.000.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51784197 |
3.898.000.000,- |
Pekerjaan Konstruksi |
Tender |
2024-07-04 |
2024-11-01 |
000.3.3/4526/DPUPR |
2024-07-04 |
000.3.3/4528/DPUPR |
2024-07-04 |
CV. Samudra Inti Perkasa |
CV. ARDI PERMANA PUTRA |
 |
|
|
Rekonstruksi Jl. Kalisuren - Pakeman |
548.795.784,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51784416 |
534.732.270,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-08-21 |
2024-11-19 |
000.3.3/5950/ DPUPR |
2024-08-21 |
000.3.3/5952/ DPUPR |
2024-08-21 |
CV. PUTRA JAYA MANDIRI |
CV. MITRA MUDA REKAYASA |
 |
|
|
Rekonstruksi Jl. Kaliwungu - Plantaran |
1.850.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51784166 |
1.802.754.050,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-28 |
2024-09-25 |
000.3.3/4332/DPUPR |
2024-06-28 |
000.3.3/4343/DPUPR |
2024-06-28 |
CV. SIMENDU MULYA |
CV ASKHA |
 |
|
|
Rekonstruksi Jl. Kebonharjo - Wonosari |
1.000.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-7.092495378356454 |
110.03483202774078 |
Rekonstruksi Jl. Kebumen - Tamanrejo |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51792898 |
198.409.578,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-10 |
2024-09-07 |
000.3.2/4751/DPUPR |
2024-07-10 |
000.3.2/4753/DPUPR |
2024-07-10 |
CV ILHAM |
CV. MULYA KARYA |
 |
-7.181727672604845 |
110.23468878585848 |
Rekonstruksi Jl. Kedungboto - Jengkol (Batas Kab. Temanggung) |
200.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-7.104050814255699 |
110.24423910537736 |
Rekonstruksi Jl. Kedungsari - Getas |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51686331 |
198.634.500,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-06-11 |
2024-08-09 |
000.3.2/3614/DPUPR |
2024-06-11 |
000.3.2/3616/DPUPR |
2024-06-11 |
CV. MULYA |
CV. MAJU MULIA |
 |
-6.911953047125607 |
110.20812087692322 |
Rekonstruksi Jl. Kendal - Bandengan (Jl. Laut) |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51649261 |
486.563.300,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-05-29 |
2024-08-26 |
000.3.3/2943/DPUPR |
2024-05-29 |
000.3.3/2945/DPUPR |
2024-05-29 |
CV. INDAH PUTRA PERSADA |
CV. SUMUR AGUNG |
 |
-6.931978655436405 |
110.20133283454925 |
Rekonstruksi Jl. Kendal - Kebondalem |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51784435 |
487.199.136,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-09 |
2024-10-06 |
000.3.3/4681/DPUP |
2024-07-09 |
000.3.3/4683/DPUPR |
2024-07-09 |
CV. PUTRA JAYA ABADI |
CV. ARDI PERMANA PUTRA |
 |
-6.923179878796026 |
110.20905925193804 |
Rekonstruksi Jl. Kendal - Ketapang |
750.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51504313 |
730.858.580,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-05-13 |
2024-08-05 |
000.3.3/2336/DPUPR |
2024-05-13 |
000.3.3/2338/ DPUPR |
2024-05-13 |
CV.Rima Tirta Agung |
CV. ARDI PERMANA PUTRA |
 |
-7.051453280432549 |
110.24792485870422 |
Rekonstruksi Jl. Kertosari - Goakiskendo |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658592 |
198.330.744,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-11 |
2024-10-08 |
000.3.2/4780/DPUPR |
2024-07-11 |
000.3.2/4781/DPUPR |
2024-07-11 |
CV KALI KUTO |
CV. SUMUR AGUNG |
 |
-7.059521245001977 |
110.28399851638824 |
Rekonstruksi Jl. Kertosari - Trisobo |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658607 |
197.745.000,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-15 |
2024-09-12 |
000.3.2/ 4879 / DPUPR |
2024-07-15 |
000.3.2/4881/DPUPR |
2024-07-15 |
CV. REJEKI AGUNG |
CV. SUMUR AGUNG |
 |
-7.0678155738210116 |
110.03567960578951 |
Rekonstruksi Jl. Krikil - Petung |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658581 |
148.980.798,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-06-19 |
2024-08-17 |
000.3.2/ 3826 / DPUPR |
2024-06-19 |
000.3.2 /3828/ DPUPR |
2024-06-19 |
CV ILHAM |
CV. MULYA KARYA |
 |
-7.14952401286359 |
110.29875808395447 |
Rekonstruksi Jl. Limbangan - Sriwulan |
800.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51502506 |
779.409.360,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-10 |
2024-09-07 |
000.3.3/3503/DPUPR |
2024-06-10 |
000.3.3/3505/DPUPR |
2024-06-10 |
CV. SOSROBAHU INDO PERKASA |
CV. MAJU MULIA |
 |
-6.981351362270187 |
110.24158742744478 |
Rekonstruksi Jl. Magelung - Sumur |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658606 |
198.778.712,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-06-21 |
2024-08-19 |
000.3.1/3998.1/DPUPR |
2024-06-21 |
000.3.1/3999.1/DPUPR |
2024-06-21 |
CV. MORO JAYA |
CV. ARDI PERMANA PUTRA |
 |
-7.160964753590023 |
110.00794569159979 |
Rekonstruksi Jl. Mlatiharjo - Ngargosari (DAK) |
2.417.635.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51737958 |
2.354.987.000,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-06 |
2024-09-03 |
000.3.3/3415/DPUPR |
2024-06-06 |
000.3.3/3417/DPUPR |
2024-06-06 |
CV. DADI JAYA |
CV. MULYA KARYA |
 |
-6.960965515330605 |
110.0765779288486 |
Rekonstruksi Jl. Montongsari - Tratemulyo |
200.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.954011174943098 |
110.07549431640658 |
Rekonstruksi Jl. Nawangsari - Sendangdawuhan |
400.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
52006057 |
389.809.000,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-09-04 |
2024-12-03 |
000.3.3 / 6377 / DPUPR |
2024-09-04 |
000.3.3 / 6379 / DPUPR |
2024-09-04 |
CV. AGKYA PERKASA |
CV. ESTU SAE K |
 |
-7.1122765965214345 |
110.06751206237826 |
Rekonstruksi Jl. Pagersari - Wirosari |
900.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-7.041217829234456 |
110.03595855552703 |
Rekonstruksi Jl. Pageruyung - Gondoharum |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658605 |
198.562.543,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-19 |
2024-08-17 |
000.3.2 / 3813 / DPUPR |
2024-06-19 |
000.3.2 / 3813 / DPUPR |
2024-06-19 |
CV ILHAM |
CV. MULYA KARYA |
 |
-7.056271832597405 |
110.03239737823608 |
Rekonstruksi Jl. Pageruyung - Selokaton |
150.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658602 |
148.962.000,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-18 |
2024-09-15 |
000.3.2 / 4984 / DPUPR |
2024-07-18 |
000.3.2 /4986/ DPUPR |
2024-07-18 |
CV. CENDANA PRIMA |
CV. MULYA KARYA |
 |
-7.1355913622018186 |
110.32370593864474 |
Rekonstruksi Jl. Pasigitan - Gonoharjo |
400.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
52006040 |
389.754.150,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-08-19 |
2024-11-17 |
000.3.3/5852/ DPUPR |
2024-08-19 |
000.3.3/5854/DPUPR |
2024-08-19 |
CV. MULYA |
CV. MITRA MUDA REKAYASA |
 |
-7.109210456985566 |
110.33512142021212 |
Rekonstruksi Jl. Pasigitan - Leban |
3.400.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51438764 |
3.309.949.585,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-05-29 |
2024-08-26 |
000.3.3/2946/DPUPR |
2024-05-29 |
000.3.3/3125/DPUPR |
2024-05-29 |
CV. GANGSAR PADOS REJEKI |
CV. MAJU MULIA |
 |
-7.175476800040425 |
110.28015428222717 |
Rekonstruksi Jl. Peron - Pakis |
400.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.876420938681069 |
110.16912566497925 |
Rekonstruksi Jl. Pidodokulon - TPI Pidodo |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51504602 |
198.500.000,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-25 |
2024-08-23 |
000.3.2/4098/DPUPR |
2024-06-25 |
000.3.3/4100/DPUPR |
2024-06-25 |
CV. ADHI WIJAYA PERKASA |
PT. TIGATO SOLUSI TEKNIK |
 |
-7.141651659566067 |
109.94292550720276 |
Rekonstruksi Jl. Plantungan - Blumah (DAK) |
5.000.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51504753 |
4.869.048.340,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-24 |
2024-10-12 |
000.3.3/4011/DPUPR |
2024-06-24 |
000.3.3/4013/DPUPR |
2024-06-24 |
CV. GANGSAR PADOS REJEKI |
CV. MITRA MUDA REKAYASA |
 |
-6.938723228728854 |
110.22620969451965 |
Rekonstruksi Jl. Rejosari - Turunrejo |
200.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.932290429436455 |
110.05654388107361 |
Rekonstruksi Jl. Rowosari - Tanjunganom |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51738024 |
487.266.260,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-01 |
2024-09-28 |
000.3.3/4382/DPUPR |
2024-07-01 |
000.3.3/4384/DPUPR |
2024-07-01 |
CV. BANGUN PUTERA |
PT. TIGATO SOLUSI TEKNIK |
 |
-6.914895088866219 |
110.04417684394869 |
Rekonstruksi Jl. Rowosari - Tawanglaut (Batas Kab. Batang) |
400.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51649242 |
389.765.020,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-08-09 |
2024-11-07 |
000.3.3/5688/DPUPR |
2024-08-09 |
000.3.3/5690/DPUPR |
2024-08-09 |
CV. RAJAWALI CITRA BANGSA |
PT. TIGATO SOLUSI TEKNIK |
 |
|
|
Rekonstruksi Jl. Rowosari - Tawanglaut (Batas Kab. Batang) (Paket 2) |
150.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.917763056429934 |
110.08267932571472 |
Rekonstruksi Jl. Sendangkulon - Pening |
400.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
52006081 |
389.770.000,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-08-13 |
2024-11-11 |
000.3.3/5749/DPUPR |
2024-08-13 |
000.3.3/5751/DPUPR |
2024-08-13 |
CV. PUTRA ANANTA |
CV. MITRA MUDA REKAYASA |
 |
-7.055392907666114 |
110.21406465210022 |
Rekonstruksi Jl. Sidomakmur - Ngareanak |
750.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.93947648420892 |
110.05164411384612 |
Rekonstruksi Jl. Sinom - Rowosari |
700.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51649135 |
682.068.335,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-08-21 |
2024-11-19 |
000.3.3/5947/DPUPR |
2024-08-21 |
000.3.3/5949/DPUPR |
2024-08-21 |
CV. Maju Makmur |
PT. TIGATO SOLUSI TEKNIK |
 |
-6.978486694505734 |
110.1961722644046 |
Rekonstruksi Jl. Sudipayung - Ngampelkulon |
700.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51541671 |
681.370.110,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-05-13 |
2024-08-05 |
000.3.3/2339/DPUPR |
2024-05-13 |
000.3.3/2341/ DPUPR |
2024-05-13 |
PT. BUDI TARAKA |
CV. ARDI PERMANA PUTRA |
 |
-6.944708635226186 |
110.18486076034608 |
Rekonstruksi Jl. Sukodono - Bulugede |
200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658604 |
198.468.000,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-05-27 |
2024-07-25 |
000.3.2/2845/DPUPR |
2024-05-27 |
000.3.2/2847/DPUPR |
2024-05-27 |
CV. UTAMA SEJAHTERA |
CV ASKHA |
 |
-6.976168041277263 |
110.21453672088685 |
Rekonstruksi Jl. Sukomulyo - Penjalin |
100.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
49658598 |
98.697.816,- |
Pekerjaan Konstruksi |
Pengadaan Langsung |
2024-07-02 |
2024-08-30 |
000.3.3 / 4438 / DPUPR |
2024-07-02 |
000.3.3 / 4440 / DPUPR |
2024-07-02 |
CV. MORO JAYA |
CV ASKHA |
 |
-6.984912080249497 |
110.21396233001725 |
Rekonstruksi Jl. Sumur - Penjalin |
500.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51649198 |
487.235.985,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-03 |
2024-08-31 |
000.3.3/3123/DPUPR |
2024-06-03 |
000.3.3/3125/DPUPR |
2024-06-03 |
CV. SOSROBAHU INDO PERKASA |
CV. ARDI PERMANA PUTRA |
 |
-6.927562583811859 |
110.06605996051805 |
Rekonstruksi Jl. Tanjunganom - Bulak |
400.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51797199 |
389.705.500,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-24 |
2024-09-21 |
000.3.3/4030/DPUPR |
2024-06-24 |
000.3.3/4032/DPUPR |
2024-06-24 |
PT. BUDI TARAKA |
CV. ESTU SAE K |
 |
-6.976726885261842 |
110.15730169136077 |
Rekonstruksi Jl. Tegorejo - Puguh |
600.000.000,- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
-6.934724997029077 |
110.06948245922105 |
Rekonstruksi Jl. Wonotenggang - Rowosari |
400.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51738044 |
389.793.570,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-11 |
2024-09-08 |
000.3.3/3568/DPUPR |
2024-06-11 |
000.3.3/3570/DPUPR |
2024-06-11 |
CV. AGKYA PERKASA |
PT. TIGATO SOLUSI TEKNIK |
 |
-7.001966019486289 |
110.11801348999143 |
Rekontruksi Jalan Mojo-Kedungasri KAB. KENDAL |
1.350.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51784404 |
1.315.377.606,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-07-10 |
2024-10-07 |
000.3.3/4724/DPUPR |
2024-07-10 |
000.3.3/4726/DPUPR |
2024-07-10 |
PT. DANUJA KARYA INDONESIA |
CV. SUMUR AGUNG |
 |
-6.972541654259444 |
110.09047177154574 |
Rekontruksi Jalan Ngasinan - Sumberagung KAB. KENDAL |
2.750.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51737966 |
2.679.876.000,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-10 |
2024-09-07 |
000.3.3/3497/DPUPR |
2024-06-10 |
000.3.3/3499/DPUPR |
2024-06-10 |
PT. ALAM RAYA BAHAGIA |
CV. SUMUR AGUNG |
 |
-6.962054451337571 |
110.14606860000643 |
Rekontruksi Jalan Pegandon - Gemuh KAB. KENDAL |
3.200.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51737969 |
3.114.176.150,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-03 |
2024-09-01 |
000.3.3/3096/DPUPR |
2024-06-03 |
000.3.3/3098/DPUPR |
2024-06-03 |
CV. SURYA MANDALA KRIDA |
CV ASKHA |
 |
-6.971117282762444 |
110.13674524147063 |
Rekontruksi Jalan REKONSTRUKSI JALAN SEDAYU KROMPAAN KAB. KENDAL |
1.000.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51784336 |
974.520.980,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-14 |
2024-09-11 |
000.3.3/3738/DPUPR |
2024-06-14 |
000.3.3/3740/DPUPR |
2024-06-14 |
CV. SURYA MANDALA KRIDA |
PT. TIGATO SOLUSI TEKNIK |
 |
-6.964738175254091 |
110.13420250732455 |
Rekontruksi Jalan Tlahap - Gemuh KAB. KENDAL |
1.700.000.000,- |
SABIDIN, ST, MT |
SABIDIN, ST, MT |
MUHAMMAD NUR FARID, S.T |
51784390 |
1.656.276.610,- |
Pekerjaan Konstruksi |
e-Purchasing |
2024-06-26 |
2024-09-23 |
000.3.3/4161/DPUPR |
2024-06-26 |
000.3.3/4163/DPUPR |
2024-06-26 |
CV. SURYA MANDALA KRIDA |
PT. TIGATO SOLUSI TEKNIK |
 |